Stanley Steam car Hubcaps2/14/2017 Hi Guys Thanks so much for all the help with the hubcap. After enjoying an awesome day at Brent’s foundry, I took the suggestion to machine the thing rather than try and cast it. Brent’s brother made the suggestion to turn the thread in reverse. That worked out great. Putting it on the buffer afterwards made it look a lot more like the casting as well. Herb
0 Comments
Steam car cylinder oil2/8/2017 Jorge Angel López Sánchez jorgejopezmec@gmail.com Hola amigos, les envío estos archivos para ver si son útiles, es mi humilde colaboración con el club, saludos cordiales. Hello friends, I send them these files to see if they are useful, it is my humble collaboration with club, best regards. Upload File 735_color_piping_diagram.jpg Upload File_2 boilerleft.pdf Upload File_3 boilerright.pdf Super Heater for a Locomobile12/30/2016 Pier Nielsen's super heater. JIM T
What series of tubing/pipe and size and how long is it? Stanley Steam Car Boiler Specification12/4/2016 BOURDON BOILER WORKS Specifications for 20hp 16" high boiler. CONSTRUCTION AND MATERIAL SPECIFICATIONS The boiler shell is assembled from five separate pieces, consisting of a cylinder, top and bottom tube sheets, and top and bottom bands. The cylinder is ¼” thick and consists of rolled plate with a vertical seam. Material consists of carbon steel (pressure vessel quality – ASTM A515, grade 70). Minimum tensile strength of this material is 70-90 KSI. A515 is a recognized material grade for boilers and pressure vessels. The inside diameter of the cylinder is 23-1/4” by 15-7/8” high. The vertical seam on the cylinder is welded from the outside, following bevel grinding. A steel bar (ASTM A36) 1” wide by ¼” thick is first clamped and centred over the joint on the inside of the cylinder extending its full length enabling full root penetration of the outside weld of the bevelled butt joint and to the backing plate. Following this operation, a single fillet weld is placed on each side of the backing plate on the inside. 7018 electrode rod is used for the above processes. The outside weld to the seam is ground flat, enabling placement of .050” diameter cadmium coated spring wire (tensile strength 309,000 pounds) between the bands. The wire is uniformly applied to the cylinder between the bands in three separate layers under tension (60 pounds). The spring wire is secured to the cylinder by screws placed into the bottom band and 1/16” holes drilled through the top bands. Breaking strength of a single wire strand is approximately 900 pounds. Tapping a steam car boiler12/3/2016 Instructions for Layout and Tapping Stanley Boilers By Don A. Bourdon, Woodstock, Vermont Stanley boilers are shipped from Bourdon Boiler Works with two pipe tap openings on the top sheet only. One is in the center and it is tapped to 3/8 NPT. It serves as the steam outlet for the throttle. The other tapping is on the outside edge on the top sheet. This is tapped to 1/8 NPT. When testing a boiler, water enters the boiler in the center as this serves as the inlet for the test pump. The tapping on the outside edge lets the air out of the boiler while it is being filled and serves as a place to attach the test gauge. Boilers typically are tapped on the bottom sheet to ¼ NPT. I tap 20 HP and 30 HP boilers with 4 openings. 10 HP or smaller boilers are ok with 3 openings. They all serve as bottom blow offs. One exception, however, may be made in the case of a surface blow off used on condensing cars. One bottom blow off is connected to the water level indicator which should be plumbed so it can be shut off from the top and bottom of the boiler, as needed. Piping A 1914 10HP Stanley Steam Car11/15/2016 Charlie Johnson was kind enough to send in some great pictures of a 1914 10HP Stanley Steam Car piping job. Take a look at some of these great under the hood shots and don't forget to leave your comments using the button at the bottom of this post. Hi Steam Car, Piping A 1914 10HP Stanley Steam Car: Thanks for posting these, confirms I have the 3 tube indicator set a couple of inches too high on our Model 607. Peter Turvey Steam car electric water gauge.10/4/2016 Ralf Denman has started to develop an electric water level indicator. The gauge is complete and the boiler indicator is being tested. |
For instructions on how to add to our community's blog post, please visit our Get Involved page by clicking on the link above!
Archives
November 2022
Categories
All
|